Step One: Substrate and Moisture Check
Most leaks traced back through a finished roof end at the layer under the sheet. Surface preparation starts with structure, not with a broom. Fill honeycombed patches, grind ridges and tie holes flush, and remove laitance until aggregate shows, because a sheet bridges a hollow but cannot cross a sharp edge. Moisture is the second gate. A reading from a calibrated meter, logged against the data sheet limit, is the only defensible record before installing waterproof membrane on a slab. New concrete needs its cure, and a damp base will not wet out beneath a self-adhesive sheet. Waterproof membrane installation begins on paper, with that number written down.
Step Two: Primer and the Bond Line
Primer est interfacies, non ornatus. Coat tantum ubi systema postulat, ad rationem in folio dati, et permitte evanescere donec sit siccus ad tactum, non viscosus. Pulvis excitatus post priming perdit cylindrum; ideo praeparatio superficiei perficitur antequam operculum auferatur. In opere flammae, primer limitat aerem inclusum; in systematibus frigidis, meliorat humectationem. Antequam membrana aquae-resistens super lastrum primatum installatur, perambula aream et reice quodlibet stagnus, saltum, aut crista; deinde annota illam acceptanceem iuxta lectionem umoris. Installatio membranae aquae-resistentis quae hanc perambulationem praetermittit hereditat omnes defectus quos debuit detegere.
Gradus Tertius: Particularia Ante Campum
Anguli, radices tuborum et effluvia decidunt opus; lamina campi solum sequitur particulam. Forma fillet in angulis internis, secet fasciculi refortificantes, imponat eos in primam stratum et extendat eos in campum satis longe ut principalis superpositio operiatur. Collarii tuborum imponuntur antequam lamina circumiacens. Ad flangiam drenagii lamina debet iacere plana, quoniam transversio per anulum constringentem est vitium quod membrana impermeabilis postea corrigere non potest. In opere PVC angulus praefactus est saldatura iuncturae facta ad mensam potius quam in altitudine. Praeparatio superficiei in his punctis est lenta opera manuum, et haec gradus applicationis membranae impermeabilis signationem requirit antequam rotulus aperitur.
Gradus Quartus: Applicatio Campi per Methodum
Tres methodi eandem ordinem sequuntur, sed non eandem technicam, unaquaeque suum numerum acceptationis habet. Electio methodi minus refert quam basis: haec decernit utrum ad 1,5 N/mm dilaniatio attingi possit. Lamina frigida autoadhaesiva 1,2 mm crassa cum pellicula PE dilaniationem praebet minime 1,5 N/mm, tractionem minime 300 N/50 mm, elongationem minime 30 %, et flexibilitatem ad −20 °C, sub pressione 0,3 MPa per 120 minutas retenta. Membrana SBS applicata flamma 3, 4 aut 5 mm crassa dilaniationem praebet minime 800 N/50 mm et elongationem minime 40 %, manet flexibilis ad −25 °C, et resistit fluxui ad 90 °C secundum normas GB 18242 et EN 13707. PVC 1,2–2,0 mm crassus et TPO, quae eodem principio saldandi utuntur, dependent a saldatura aere calido aut cuneo calido; ideo qualitas saldaturarum iuncturarum totam installationem membranae impermeabilis determinat, et examen inundationis, quod duobus gradibus postea fit, est examen finale.
Gradus Quintus: Superpositiones, Pressio et Qualitas Saldaturarum
Un lapus est iunctura, et iuncturae percolant antequam laminæ; praeparatio superficiei finitur ad marginem lapus, ubi pulvis omnem rulotum vincit. Superpositiones SBS extenduntur 80–100 mm, rulotae valide a centro ad exteriorem ut nullus aeris saccus sub linea exsudationis maneat. Lapus autoadhaesivi exigunt eandem pressionem rulotis, et continuus bituminis cuneus ad marginem est signum installationis membranæ impermeabilis acceptabilis; marginis aridi significat lapum apertam quam testis inundationis detegit. Iuncturae PVC suctae habent latitudinem 40 mm et examinantur aut per probam aut per detractum exemplar ex iunctura experimentalis. Iunctura succa quae canalem, ustionis notam aut frigidam marginem relinquit, reprobanda est. Dum membrana impermeabilis installatur, lapus servanda sunt mundi: nam granulum sub lapu fit foramen pungens, et lapus sunt loci ubi prima defectio installationis membranæ impermeabilis oritur. In tecto magazini PVC, opifices secuerunt exemplar succi singulis turnis et affixerunt fasciculos ad tabulam operis, ut frigida mar- go numquam in campum perveniret.
Gradus Sextus: Inspectio et Testis Aquae
Inspection runs twice: a 100% visual walk for wrinkles, fishmouths and unsealed penetrations, then a targeted check of every seam welding pass and detail. Only after that does a flood test mean anything, and on horizontal areas it is the only proof that counts. Fill, mark the level, hold it for the duration the specification sets, then read again; loss beyond evaporation points to a defect. That test is part of installing waterproof membrane, not an afterthought. A hurried waterproof membrane installation shows first at the upstands, and surface preparation is usually where the fault began.
Quaestiones Frequenter Rogatae
How long should a flood test run?
The specification sets the duration, not the contractor. What matters is a level record taken at the start and again at the end, read against a fixed datum, with evaporation allowed for. Installing waterproof membrane without that record leaves nothing to argue with if a leak appears later.
Can sheet go onto damp concrete?
No. A damp pore will not accept adhesive, and trapped moisture becomes vapor pressure under sun, lifting the sheet long before any flood test is due. Surface preparation includes drying time, and a meter reading against the data sheet limit is the release condition before any waterproof membrane installation proceeds.
Which method suits a basement wall?
Cold self-adhesive sheet at 1.2 mm keeps flame out of a confined space, with 1.5 N/mm peel and 0.3 MPa impermeability; torch-applied SBS at 800 N/50 mm suits heavier abuse where permits allow it. Detail work at the wall base decides the outcome, and seam welding skill never rescues a lap that was never rolled; a flood test above will expose it.